mullaneycutie9596 mullaneycutie9596
  • 13-09-2022
  • Business
contestada

a deliverable in a process breakdown structure (pbs) is defined as:multiple choice question.an output of some activity allowing the start of a new project phase.a clearly defined, specific product or service described by the project scope.an intangible outcome.

Respuesta :

Otras preguntas

in what ways did the Cherokees adopt white culture
What happens to most of an ecosystem’s energy?
What type of writing would most likely include a "call to action," encouraging the reader to act in some way? A.narr
The area of the base of a prism is 24 mm2. The perimeter of the base is 22 mm. The height of the prism is 5 mm. What is the surface area of the prism?
A three-letter word used to show division in a word problem.
Determine the pressure change when a constant volume of gas at 1.00 atm is heated from 20C to 30C
What happens to most of an ecosystem’s energy?
which of the following contributed to the Ottoman Empire's territorial expansion? A. Because of its wealth, the empire was able to buy lands it wanted. B. The O
what's 4 2/3 times 2
Which sentence contains a misplaced modifier? A. I had never heard of rental shoes or even been in an alley. B. Down the lane and past the pins, my friends laug