kavankp1386 kavankp1386
  • 15-05-2023
  • Engineering
contestada

Use of prefabricated modules as an alternative to built-in-place construction, are best evaluated during the______ phase. Select one: A conceptual B. early design C. construction D. evaluation

Respuesta :

Otras preguntas

Chase is trying to calculate the total cost of the T-shirt that he's buying. Since it's on sale, he first found the amount of the discount and added that to the
What is equivalent to 7/10??
Which of the following statements best characterizes challenges placed on the US by conditions in Somalia from 1999 to 2009? A. War and instability in Somalia d
what kind of heat we feel from the sun
405 divided by 25 show all work
kim order a sandwich and had it cut into equal pieces she and 3 friends ate the same number of pieces 1/4 of the sandwich was not eaten .for dinner that night,
A recipe calls for 2 2/4 cups of raisins, but Julie only has a 1/4 cup measuring cup. How many 1/4 cups does Julie need to measure out 2 2/4 cups of raisins?
Rachel jogged along a trail that was 1/4 of a mile long. she jogged along the trial 8 times. How many miles did Rachel jog in all?
What economic troubles did france face in 1789, and how did they lead to future unrest ?
What is 49/63 in simplest form?