toot6976 toot6976
  • 12-02-2024
  • Engineering
contestada

The ____ estimating method can be used with any building layout and provides the estimator the opportunity to account for variables on an overall basis without having to contend with the fine detail of the design.

Respuesta :

Otras preguntas

How is continental crust different from oceanic crust?
what is 2^3 * 3^4 ? A.162 B.324 C.468 D.648ITSS MATH SORRY
An unconformity is a ______ of rock.
Which of the following identifies the patterns used for each data series in a chart? A. Legend B. Data point C. Data series
Every time energy is transferred in an ecosystem, potential energy is lost. A) as heat. B) due to weather. C) because some animals die. D) when it is recycled b
What does antidote means?
What is the density of a 700 kg object with a volume of 649 m3? (Density: D = ) 0.927 kg/m3 .4543 kg/m3 1.079 kg/m3 4.543 kg/m3
Paul's dad made a turkey pot pie for dinner on Wednesday the family ate 4/8 of the pie. on Thursday after school,Paul ate 2/16 of the pot for a snack what fract
(06.01) What is the value of the expression shown below? + 7 × 4 − 5 (4 points) Select one: a. b. c. d.
How much must you deposit in an account that pays 8% interest, compounded monthly to have a balance of $1000 after 3 years?