julieisnor9468 julieisnor9468
  • 16-02-2024
  • Business
contestada

The operations of a manufacturing / assembly line need to produce 1500 units per one 8-hour shift. During the 8-hour shift just 30 minutes is allowed for break times. The current performance rate of the production line is 77.5. What is the total time available for production during the 8-hour shift?

Respuesta :

Otras preguntas

Use slope and y intercept to graph a line. y=2x-5
What ordered pair is the vertex of y=|x+5|-1
Paul has 15% of his gross pay directly deposited into a mutual fund account each month. If $630 is deposited each month, what is his monthly gross pay?
The slope of a line is -1/3 and the y-intercept is 10/3. What is the equation of the line written in general form?
What is the average of the integers from 25 to 41? 27, 33, 36, 66 ?
Write an equation in slope-intercept form of a line with the following characteristics: parallel to the graph of: -4x + 3y= 12 and passes through the origin.
write equation in standard form Ax + By = Cm=7 (6,6)
Write the Riemann sum to find the area under the graph of the function f(x) = x3 from x = 2 to x = 5.
I run for my life. What does this sentence mean? How to understand "for my life"? What scenario is it?
'How to solve: y=2x-2 y=-x+1 pelase help'