haleygrobertson70291 haleygrobertson70291
  • 14-03-2024
  • Business
contestada

What is the optimum schedule of the project and minimum duration with the corresponding cost?

a) 5-6 days, Rs. 180
b) 6-10 days, Rs. 300
c) 9-11 days, Rs. 120
d) 10-12 days, Rs. 450

Respuesta :

Otras preguntas

Which details are stated explicitly? Check all that apply. Food is extremely valuable today. A flock of sheep in Elizabethan England was more valuable than a m
which of the following equations best describe this relation? A. C= -3n+2 B. C= 3n-2 C. C= -3n-2 D. C= 3n+2
List 5 achievements of the Romans. please and thank you!!
In an effort to be published, Franklin the boy _____.
The value of a car depreciates by 18% per year. Work out the current value of a car bought 4 years ago for £20000.
How does recycling help reduce pollution? A. It reduces the number of trips a household needs to make to the store by reducing the need to buy new items. B. I
In a short response of at least three complete sentences, define dream sequence and explain its effect on a traditional plot structure. (15 points)
The sum of three numbers is 10. Two times the second number minus the first number is equal to 12. The first number minus the second number plus twice the third
(b) Explain how producing the enzymes that digest α-pinene is beneficial to the bacterial species living within the nematodes.
Which pH would correspond to a substance containing a lower concentration of hydrogen ions than hydroxide ions? Question 2 options: pH 12 pH 7 pH 6 pH 2