asia2650 asia2650
  • 16-01-2020
  • Physics
contestada

A rock climber weighs 550N and is carrying a backpack that weighs 50N. How much total work has been done after she climbs 12M

Respuesta :

MathPhys
MathPhys MathPhys
  • 16-01-2020

Answer:

7200 J

Explanation:

Work = force × distance

W = (550 N + 50 N) × (12 m)

W = 7200 J

Answer Link

Otras preguntas

Keisha runs 12 miles in 98 minutes. how many miles does she run per minute?
Brain development supports overall child development in
What state was not part of the Southwest?? A.)Texas B.)Oregon C.)Utah D.)Arizona
Cats received a fish reward whenever they maneuvered themselves out of an enclosed puzzle box. with successive trials, the cats escaped from the box with increa
Where would phytoplankton most likely be found
What is the solution for this equation -9y=9
Carlos and Maria drove a total of 197 miles in 3.8 hours. Carlos drove the first part of the trip and averaged 55 miles per hour. Maria drove the remainder of t
Over the last three evenings, Ashley received a total of 106 phone calls at the call center. The third evening, she received 2 times as many calls as the se
Lilli jogs 1/2 mile in 1/10 hour. What is Lilli's rate in miles per hour?
Courts of general jurisdiction typically have?