5. A can do a piece of work in 8 days which B alone can
do in 10 days. In how many days both working
together can do it?​

Respuesta :

lifelongknowledge62 lifelongknowledge62
  • 13-09-2020

Answer:

In 1 day A can do 1/8 work

In 1 day A can do 1/10 work

in 1 day A+B can do (1/8 +1/10) 40rk

in 1 day A=B can do 9/40 work

so In 1/ (9/40) days A+B can do work together = 40/9 days

Step-by-step explanation:

Answer Link

Otras preguntas

A concert brought in $ on the sale of tickets. Two types of tickets were sold: General audience tickets which cost $ each and balcony tickets which cost $ eac
im terrible with literary devices so can somebody help me analyze the song "gone" by bebe rexha? its due by friday
1. Sharon will borrow $3400 at 11% APR. She will pay it back over 18 months. What will her monthly payment be? (Use table) A) $ 512.42 B) $ 220.06 C) $ 681.50 D
Please help! I really need it
Which of the following cleavage types occurs parallel to the bottom surface of a crystal
1. Make up two equations, one that is true and one that is false. Do not state which equation is true and which is false. Your classmates will have to determine
Autonomous underwater explorers will be used to gather large-scale ocean information. True or False.
Water is a _____. ionic molecule covalent molecule polar covalent molecule simple compound
Given ∆QRS≅∆TUV, QS=4v+3, and TV=7v-9, find the length of QS and TV.? a. 37 b. 4 c. 19 d. 20
PLEASE HELP! - By the time energy from the sun has reached Snappy and the food she eats, how much of that original energy is still available to her? (Snappy was