  • Mathematics
contestada

if 3 people can complete a job in 4 days, how many days will it take to complete the job with 5 people?

Respuesta :

briangetalla briangetalla
  • 12-12-2020
2.4 days because 3x4=12/5 =2.4
Answer Link

Otras preguntas

A stock currently sells for $44. The dividend yield is 3.3 percent and the dividend growth rate is 4.6 percent. What is the amount of the dividend that was just
plastics are used to make electrical wires. Explain ​
2.Show that: (sinΘ + cosΘ)^2 + (sinΘ - cosΘ)^2 = 2
Why most people livings in the region live near the rio grande river
(9,5) and (4,-7) find the distance between two points
explain how a rational number and an irrational number and different ​
find the length of a line segment whose endpoints are (-2,3) and (6,3)
What are the steps for using integer tiles to evaluate the expression 45-15? ООО Start with 15 tiles and separate them into 3 same-sized groups. Start with 45 t
Is a temperature of 35 degrees Fahrenheit as cold as a temperature of -35 degrees Fahrenheit?
Volcanoes are a ______________ influence on climate on human timescales (i.e. years) and a _____________ influence on climate on much longer timescales (i.e. mi