astaria1
astaria1 astaria1
  • 14-01-2021
  • Business
contestada

A company pays it's workers 20$ a day .
Is it a fixed cost or variable cost ??​

Respuesta :

crybabxos
crybabxos crybabxos
  • 14-01-2021

Answer:

Examples of variable costs are sales commissions, direct  costs, cost of materials used in production, and utility costs. ૮(0w0)

Explanation:

Fixed costs remain the same, whether production increases or decreases. Wages paid to workers for their regular hours are a fixed cost. Any extra time they spend on the job is a variable cost. In a factory that makes dresses, the variable costs are the fabric and the  used to make the dresses.

Ver imagen crybabxos
Answer Link

Otras preguntas

a list contains the names of five anthropology students, three sociology students and four psychology students. If one name is selected at random to assist in t
During this stage of résumé review, résumés are quickly scanned to eliminate as many candidates as possible: a. stage 1 b. stage 2 c. stage 3
Find the missing side ength to the nearest centh of a millimeter.
thank you to whoever helps me
What does it mean to be "a force to be reckoned with".
Who is better, Susan B Anthony or Thomas Jefferson?
Which pyramid has a greater volume, and how much greater is its volume? A rectangular pyramid on the left with a base of 7 inches by 6 inches and height of 3 in
If the number 561 is multiplied by 10^3, in what place value will the 1 be?pls help
Find the value of x.
what is slope. (i genuinely need to know)