johnsonbe054
johnsonbe054 johnsonbe054
  • 15-01-2021
  • Mathematics
contestada

If 10 men can cut a piece of lawn in 4
days, how long will it take 8 men to
cut the same lawn?​

Respuesta :

rjnelson
rjnelson rjnelson
  • 15-01-2021

Answer:

About 3

Step-by-step explanation:

Answer Link
princessia
princessia princessia
  • 15-01-2021

Step-by-step explanation:

10 men =4 days

8 men =x days

cross multiply

10×x=8×4=24

Answer Link

Otras preguntas

what is the square root of 144 simplified
The equation x2 + y2 − 2x + 2y − 1 = 0 is the general form of the equation of a circle. What is the standard form of the equation?
the surface area of a right triangular prism is 228 square inches. The base is a right triangle with a base height of 6 inches and a base length of 8 inches. Th
8+—3(6+—6a) help please
when did the first eastern european country join European union
Which word correctly completes the sentence?During August that ______ shoe department puts many items on sale.         A. stores       B. store's
Which sentence does not contain any errors in comma usage?   A. We have seen apes at the
A 15 cm3 block of gold weighs 2.8 N. It is carefully submerged in a tank of mercury. One cm3 of mercury weighs 0.13 N. a. Will the mercury be displaced by the g
You are a school photographer taking individual and class pictures for 2 classes of 21 students each. On average, each individual picture takes 3 minutes and a
when did the first eastern european country join European union