Seudónimo Seudónimo
  • 13-07-2021
  • Mathematics
contestada

A construction crew is completing about 40 yards of a new highway each day. At this rate, how long will it take them to complete a stretch of 1.6 miles?

Respuesta :

onyikeinnocent
onyikeinnocent onyikeinnocent
  • 24-07-2021

70 days

that is the procedure above

Answer Link

Otras preguntas

the strongest plant cells are?
What type of rock does preexisting rock become
What important idea from Thomas Malthus inspired Darwin?
How do I solve what is 2/3 of 90
Ema bought 6 bags of walnuts . Each bag contained 3/4 of a pound of walnuts . What was the total weight of the walnuts??
In "The Mark of the Beast," how does the narrator feel about Eastern Gods at the end of the story?
8x-2(x+1)=2(3x-1) A.0 B.2 C.no solution <-- that's what I think it is. D.identity. Can someone check my answer
danica has laid out floor tiles so they form a rectangle with a perimeter of 18 inches. what is the difference between the greatest and least possible areas of
The Lamborghini Diablo sports car can accelerate from 0.0 km/hr to 99.2 km/hr in 4.0 seconds. What is the acceleration of this car? Give your answer in units o
In "The Mark of the Beast," how does the narrator feel about Eastern Gods at the end of the story?