kr32579
kr32579 kr32579
  • 11-12-2021
  • English
contestada

Taking each hazard one at a time to minimize risk is called:
1. Separate
2. O Minimize.
3. O Compromise.
4. O All of these.

Respuesta :

Kayshacadinha Kayshacadinha
  • 12-12-2021
2. Minimize
Hope this helps
Answer Link
lillyandizzy
lillyandizzy lillyandizzy
  • 12-12-2021
minimize , im pretty sure
Answer Link

Otras preguntas

hey can anyone help I'm so confused on how to this :)
I need 10 facts about Hurricanes for Science
∈∉Ф⊅⊅⊄⊄⊆⊂⊃ What do these all mean???
sonya can walk 12 kilometers in 4 hours. If she has to walk 15 kilometers, how much time will it take her?
The government has the greatest degree of involvement in which of thefollowing?command economyO market economylaissez-faire economy
Find the area and perimeter of an isosceles trapezoid with a 60° base angles and bases 9 and 13.
Three balls are packaged in a cylindrical container as shown below. The balls just touch the top, bottom, and sides of the cylinder. The diameter of each ball i
If 3t-7= 5 then 6t =
Simplify the expression. x^2+3x+2/x+2
name at least two indicators to help determine standard of living