gilbertfart10
gilbertfart10 gilbertfart10
  • 14-12-2021
  • Mathematics
contestada

plz help me!!!!! D::::

plz help me D class=
plz help me D class=

Respuesta :

mathstudent55
mathstudent55 mathstudent55
  • 14-12-2021

Answer:

16 tons

$9108

Step-by-step explanation:

Let t = number of tons.

First company:

cost = 100.5t + 7500

Second company:

cost = 175.75t + 6296

At what number of tons are the costs equal?

We set the two cost equations equal and solve for t.

175.75t + 6296 = 100.5t + 7500

75.25t = 1204

t = 16

The costs are equal for 16 tons.

The cost for 16 tons is:

cost = 100.5t + 7500

cost = 100.5(16) + 7500

cost = 9108

At 16 tons, the cost is $9108

Answer Link

Otras preguntas

The apps in office are bundled together in a group called
Find the error in this passage, and then identify what type of error it is. Basic hygiene includes washing your hands after using the bathroom. However, many pe
In the chart, the missing classification term is A) domain B) species C) specimen D) common name Kingdom: Animalia Phylum: Chordata Class: Marrnalia Order: P
What is the area of a section of pavement that is 20 ft wide and 50 yd​ long? give your answer in square feet?
Walmart company own which stores and brands
Bill james discovered that a transaction for utilities expense was journalized and posted in error as a debit to repair expense, $250. what is the entry to corr
Two and a half men when did ashton kutcher came on the show
PLEASE HELP I WILL GIVE BRAINLIST
Third-degree, with zeros of 4-I,4+I and a leading coefficient of -5
PLEASE HELP ASAP! Will give brainliest!!