ANAi3tzenaawe1stor ANAi3tzenaawe1stor
  • 16-01-2017
  • Mathematics
contestada

A construction crew has just built a new road. it took them 7 weeks to build 8.75 kilometers of road. at what rate did they build the road?

Respuesta :

Аноним Аноним
  • 16-01-2017
7 weeks = 8.75

1 week = x

where x is the kilometers of road built in a week

Proportion:

8.75/7 = x/1

7x=8.75

x=1.25
Answer Link

Otras preguntas

How does overcrowding affect a population's size?
Which of the following are considered customs and traditions of the United States government even though they are not formally mentioned in the Constitution?
Although susan is a brilliant pianist and highly acclaimed ballet dancer, her high school intelligence test scores were only average. what does susan's experien
Why is strategy implementation referred to as the "graveyard of strategy"? it is a process that is independent of strategy formulation and is not necessary to e
Jane and mark each build ramps to jump their remote controlled cars. both ramps are right triangles when viewed from the side. the incline of jands ramp makes a
5664 Tyndall lake apartment 3-A
A rectangle prism has a length of 12 in., a width of 5 in., and a height of 4 1/4 in. The prism if filled with cubes that have edge lengths of 1/4 in. How ma
What was the allied response to the soviot blockade of West Berlin
PPLLLZZ HELP I AM GIVING BRAINLIEST AND 50 POINTS!!!!!!
Appeasement proved a poor strategy for slowing German expansion because: A.the United States was committed to drawing Germany into a military conflict. B.there