tinylittledancer8 tinylittledancer8
  • 12-09-2022
  • Mathematics
contestada

If it takes 4 workers 21 hours to paint how many hours will it take 12 workers?

Respuesta :

m11233982
m11233982 m11233982
  • 12-09-2022

Answer:

63 hours

Step-by-step explanation:

4 workers = 21 hours

12 workers = g

[tex] \frac{21}{4} \times 12 \\ = 63hours[/tex]

Answer Link

Otras preguntas

Do I multiply 60% of 68
Which is a method used by the first ruler of the Qin Dynasty to control his empire?
this is the main human activity that contributes to global warming... A-massive dumping of pesticides into the worlds oceans B-high demand and depletion of the
The function C(t) below relates outside temperature in degrees Fahrenheit to the number of cricket chirps per minute. It takes as input the temperature in degre
The hypotenuse of a 30- 60- 90 triangle has length 13. What is the length of the side opposite the 60 angle? If necessary, round your answer to two decimal plac
Which of the following is not a carcinogen? A. radiation B. tobacco smoke C. asbestos D. DNA
PLEASE help i'm really confused! What is the pattern of the predator-prey relationship shown on this graph? A. There is an increase in the prey population as
El Año Nuevo es el __________ de enero.
Name the parts of an introduction paragraph for an informational article
In the 7th amendment aside from criminal cases, in what types of cases are defendants guaranteed a jury trial?