alyssawilmoth1
alyssawilmoth1 alyssawilmoth1
  • 15-09-2022
  • Mathematics
contestada

A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

Respuesta :

Aswanglol6
Aswanglol6 Aswanglol6
  • 15-09-2022

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96

Step-by-step explanation:

Answer Link

Otras preguntas

(3.0*10^6)(2.5*10^5) equals what
A fish tank has the dimensions 40cm 30cm 50cm. What is the capacity
Please solve a,b and c
Can somebody please explain mean, mode, median? ☆
1. Why should we study health? 2. What is the difference between emotional and mental health? 3.Why do you think life expectancy has increased so much? 4. What
. Find the quotient of -135 divied by 15
What was the political legacy of the Achaemenid Empire? -Thank you!
To prove :One plus cot square theta into tan theta by sec square theta = cot theta
what were the consequences of world war two
Which event is most likely to happen? A) selecting a vowel from the word RADIATION B) turning ‘heads’ on a flipped coin C) picking a blue ticket from a hat con